Sign In | Join Free | My xuijs.com
China Hebei Kaixiang Electrical Technology Co., Ltd logo
Hebei Kaixiang Electrical Technology Co., Ltd
Active Member

7 Years

Home > AC Load Bank >

1000KW AC Load Bank For Backup Power Supply Generator UPS Transformer

Hebei Kaixiang Electrical Technology Co., Ltd
Contact Now

1000KW AC Load Bank For Backup Power Supply Generator UPS Transformer

  • 1
  • 2

Brand Name : KAIXIANG

Model Number : 1000KW

Certification : ISO9001

Place of Origin : HEBEI CHINA

MOQ : ONE SET

Price : negotiable

Payment Terms : L/C, D/A, D/P, D/P, T/T, Western Union, MoneyGram, D/P

Supply Ability : 20 SETS ONE MONTH

Delivery Time : ONE MONTH AFTER GET DEPOSIT

Packaging Details : WOODEN CASE

Rating Voltage : 400VAC/50Hz, 3 phase 4 wire

Rated Load Power : Resistive load: 1000kW

Rated Voltage : 400 VAC

Installed Capacity : Resistive load: 1000kW

Load Tolerance(overall) : ±3%

Control Power : 380VAC/50Hz, 3 phase 4 wire, 230V 1-phase

Contact Now


1000KW AC Load Bank For Backup Power Supply Generator UPS Transformer

Product Description


1. Automatic AC load bank main used to test the capability and aging degree for high-power ups on-line, inverter, switch power and diesel generator set for electric power, telecom department and manufacturer.
2. It can ensure the reliability of constant power charge that adopts uniformly stepped power input, energy consumption work model and forced air-cooling model.
3. It is of high power density, no red hot phenomenon and automatic protection function overheated.

Technical Parameters

Rating Voltage/Frequency400VAC/50Hz, 3 phase 4 wire,
Rated Load PowerResistive load: 1000kW
Installed CapacityResistive load: 1000kW
Load Step1,2,2,5,10,20,20,50,100,200,200,200,200kW, min step load: 1kW
PF(Power Factor)1
Load Tolerance (each step)±5%
Load Tolerance(overall)±3%
Display Precision0.5 class
Control Power380VAC/50Hz, 3 phase 4 wire,
Wire Connection

Load power supply input——Copper bar (star coupling)
Control power supply input——Connector-bar

InsulationF
Duty CycleContinuous
Casing Dimensions and Coolingabout 1680*2400*1440mm (length*width*height) Forced air cooling,Horizontal inlet air,Horizontal outlet air
WeightAbout 1200kgs/set
TransportationHoisting, there are lifting lug in top of casing
Casing ColorGrey(RAL7035)
Ambient Temperature-10℃~+50℃
Relative Humidity≤95%
Altitude≤1500 meter
Atmospheric Pressure86~106kPa
ContactorSchneider
FuseDELIXI
MCUINFINEON
Data processing softwareKaixiang(self-developed)
Alloy ResistanceKaixiang(self-developed)


Product Advantage

Control mode interlock: there is switch in control panel to choose control mode, other control mode is invalid if user choose one control mode.
With data processing software, could form curve of current, active power, reactive power, apparent power, power factor, frequency and can be printed.
One-key load/unload: user can load or unload with one key easy to control.

Application

Manufacturers of standby power generators commonly use load banks to test and tune newly assembled units. When the generator has been set up in a test cell within the factory, a test engineer uses the load bank to apply a discrete, selectable electrical load to the generator and measure the response stability and endurance. During this process, the test engineer calibrates and adjusts the generator performance to ensure it meets the intended product specifications and tolerances.

1000KW AC Load Bank For Backup Power Supply Generator UPS Transformer
























Product Tags:

programmable ac load bank

      

resistive reactive load bank

      
Best 1000KW AC Load Bank For Backup Power Supply Generator UPS Transformer wholesale

1000KW AC Load Bank For Backup Power Supply Generator UPS Transformer Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Hebei Kaixiang Electrical Technology Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0